A spare is useful when its reference and revision match the machine delivered. Ask which parts the seller includes with the case packer and which must be ordered separately. Build the list from the fitted configuration and the formats you will run first.
Prioritize what could stop production
Confirm evidence for part codes, fit and supplier availability. Include a named person to check the delivery and record damaged or missing items. Store the list beside the drawings, photos and first production schedule.
| Priority group | Record | Quantity and owner |
|---|---|---|
| Parts for first format | Drawing and machine reference | ___ |
| Routine wear parts | Code, revision and lead time | ___ |
| Controls or sensors | Exact fitted version | ___ |
| Loose pieces at delivery | Packing reference and receipt check | ___ |
Include parts and documentation in the equipment handover
Check the first spares with the seller
Send serial number, first case format and the list of required components.